Friday, April 13, 2012

April 13, 2012. Canyon Lake, Texas. The bunk house.

Now It looks like a little house that you could live in.  The new bunk beds were delivered this morning and the men assembled the three new beds.  It is not as easy job as there must be several hundred parts.  And Chris the carpenter brought over the bed from the ranch house and put it in place.  Now we have four bunk beds all ready for eight little girls.

The place was a beehive of activity this morning at the bunk house.  Carpenter Chris was finishing installing the sink, broken when the electrician stepped on it, while the two delivery men were working.  At one time there were four men working in that small space.  I loved it.

Two tasks remain:  the permanent water line and the new electrical service.  As soon as the Pedernales Power installs the new system, Pat the electrical will run the wires and install the plugs for the trailers.   And Alan will run the new water lines.  Then the bunk house will be ready to be used.  Hope the girls like it.

No comments: