Sunday, September 29, 2013

September 28, 2013. Harper, Texas. Progress.

There is nothing I like better than seeing progress and getting ahead.  We arrived home from Fredricksburg this afternoon to find two trucks in the yard and two men working on the electrical system.  Both Ken and I cheered.   The working men were installing the outdoor, walk in fridge, but first they were required to run a line from the electrical box.   By the time we arrived, the fridge had been leveled and just needed electricity.  By the time we came down the hill after unloading the groceries and eaten a dish of ice cream, the fridge was working just fine.  Progress indeed.

Then the two men set about installing more plugs for the trailers.  I was told in an e mail this afternoon that the trailers will begin arriving on Thursday or Friday and that they will all be in place by Monday the 7th.  Hurrah.  That will give me time to set up each trailer with supplies and bedding, before anyone arrives.   Pat, the electrician is pleased too.  He does want to be sure that each trailer is plugged into the electrical grid!!

This was all good news today.  I call that progress.

No comments: