The task is only partly completed. We suspected it was so because we had not gotten a bill, but we were hoping the job was all done. The railings have been installed along the front steps. They look peculiar and primitive but the rail is sturdy and will do the job to allow us access without falling. It appears that the rains have interfered. One step is set for more concrete but nothing installed yet.
The grass on the two levels looks great. Actually it looks as though the grass was always there. Now the area will be useful. When the grandchildren were young, the first level had a big sand box and the other end a climber. We had mulch on the ground. We removed those two objects. Now it has grass so could be used for boce or croquet. The lower lever has a horse shoe pit so will be still useful. Now it looks good too. The path across the levels will be done but so far all we see is a strip of plastic. I actually can not remember what will be on the walk.
But progress has been made. I wish the task was completed so we could pay the bill before we leave for Mississippi. I will call them tomorrow. They will tell me that the rain has come down hard every day, making it impossible to work. Want to bet?
Thursday, November 10, 2016
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment